
To enhance the traffic quality of the X226 Fengshan - Guoqiaolong Road and ensure the safety of vehicle and pedestrian travel, pavement repair construction is being carried out on this section.To ensure the safety of everyone's travel from the main gate to the north gate of the scenic area, the relevant matters are hereby announced as follows:
This construction project will commence on December 22, 2025 and end on February 8, 2026, with an estimated total duration of 48 days (including marking construction).
1. During the construction period, a traffic control measure of half passage and half construction will be implemented on this section of the road. Vehicles and pedestrians passing by are requested to strictly abide by the on-site traffic guidance signs, slow down and pay attention to safety.
2. Unrelated vehicles and personnel are strictly prohibited from entering the construction area to prevent safety accidents.

▲ Construction section
Click the link below to view the recommended articles
The source of the Dongjiang River brings peace of mind not far away
Welcome to use Anyuan Yima You
↓↓↓↓





编校(审):唐 婕、赵 堃